The rating that carries a whole plant: factories, hospitals, data centres and mining camps. Prime 320 kW / standby 352 kW, parallel-ready, containerised or silent canopy.
Indicative configuration — final datasheet issued per order. 60 Hz version available at 480/277 V.
| Item | Specification |
|---|---|
| Prime power (PRP) | 320 kW / 400 kVA at 0.8 pf |
| Standby power (ESP) | 352 kW / 440 kVA at 0.8 pf |
| Voltage / frequency | 400/230 V, 50 Hz, 3-phase 4-wire (480 V / 60 Hz optional) |
| Engine options | Cummins QSZ13-G3 · Perkins 2206C-E13TAG2 · Weichai WP13 series |
| Alternator | Brushless, single bearing, IP23, class H, 2/3 pitch for parallel operation |
| Controller | Deep Sea DSE7320 MKII, ComAp InteliGen or equivalent AMF / parallel controller |
| Fuel consumption | 100% load 76 L/h · 75% 57 L/h · 50% 40 L/h |
| Fuel tank | 8-hour integral base tank (600 L), lockable, level gauge, drain valve |
| Noise (silent canopy) | 75 dB(A) at 7 m |
| Dimensions (silent) | 4300 × 1500 × 2200 mm |
| Weight (silent, wet) | ≈ 3800 kg |
| Options | ATS, parallel panel, containerised CSC version, trailer, remote monitoring, fuel polishing, exhaust silencer to 65 dB(A) |
Derating: at 2000 m a 400 kVA set behaves like about 352 kVA; at 50 °C ambient like about 384 kVA. Combine both factors when specifying high-altitude or desert sites.
| Load type | Typical allowance | Note |
|---|---|---|
| Mixed plant load | 224–256 kW average | 70–80% of prime, allows starting surges |
| Motor, direct-on-line | single motor ≤ 160 kW | Voltage dip must stay under 15% |
| Motor, soft start / VFD | single motor ≤ 220 kW | Current limited to 2–3× rated |
| UPS and rectifier load | ≤ 256 kW | Check THD; 6-pulse UPS needs derating or filter |
| Parallel pair | 640 kW prime / N+1 at 320 kW | Requires parallel panel and matched alternators |
CE with 2000/14/EC noise marking, EPA Tier 4 Final on request, SONCAP (Nigeria), SASO/SABER (Saudi Arabia), EAC (Russia, Central Asia), destination CoC where required.
One silent 400 kVA set per 40 ft HQ container. Containerised CSC version ships as its own shipping unit — practical for remote sites where unloading equipment is limited.
English manual, factory load test report with video at 25/50/75/100% load, wiring diagram, packing list, certificate of origin, spare-parts list.
Commissioning guidance, two operators trained, remote diagnostics, wear-parts kit, and a recommended critical spares list for 2000-hour operation.
320 kW continuous at 0.8 pf. Plan 224–256 kW average for continuous duty. Standby rating is 440 kVA / 352 kW for outage periods. A single motor up to 160 kW can usually be started direct-on-line.
76 L/h at 100% load, 57 L/h at 75%, 40 L/h at 50% — 0.21–0.24 L/kWh. Running 250 kW for 10 hours consumes about 540–600 litres.
Indicative FOB China 2026: USD 28,000–42,000 for a silent set. Engine and alternator brand, controller type, and containerised or parallel-ready configuration drive the difference.
Yes, with matched alternators, electronic governors and a parallel panel providing synchronisation, load sharing and reverse-power protection. Two sets give 640 kW prime, or N+1 redundancy at loads below 320 kW.
Send the load list and site conditions — altitude, ambient, motor starting method — and we return the calculation plus three configuration tiers.