Genset Butler covers the whole life of a diesel generator: load-based sizing, pre-shipment inspection, troubleshooting, scheduled maintenance, genuine spare parts and export after-sales. 4-hour response in China, remote diagnosis plus local stock abroad.
Each mistake has a price tag: overpaying, mis-diagnosing, or standing still for weeks.
| Problem | Typical damage | How we handle it |
|---|---|---|
| Undersized set | Runs at 100% load; oil consumption and scored liners cut life from 15,000 h to 6,000 h | Size on max continuous load ÷ 0.8, then verify starting current, altitude and ambient derating; keep 20% headroom |
| Overstated rating | “200 kW” unit cannot carry 150 kW; three months of arguments over return | Check ISO 8528 nameplate, PRP/ESP dual rating and factory load test; verify on site at arrival |
| Refurb sold as new | New-machine price for an 8,000-hour unit; overhaul within six months | Five-point inspection: hour meter, casting numbers, disassembly marks, exhaust carbon, paperwork |
| Uncontrolled downtime | Data centres, hospitals and farms lose thousands per hour | Critical spares list, 4-hour response, standby unit option — downtime measured in hours, not weeks |
| No overseas support | Machine idle two months on an African site waiting for parts; project penalties | Remote diagnosis with video and controller data, local parts stock, two local operators trained at commissioning |
| Missed maintenance | Filters overdue, oil degraded, overhaul 3,000 hours early | Maintenance programme on a 50/250/500/1000-hour schedule with automatic reminders and photo records |
From “which set do I buy” to “will it still be repairable in ten years”.
Load first, brand second. You receive a complete configuration sheet — engine, alternator, controller, canopy, paralleling — in three price tiers, so you know where every dollar goes.
Diagnose first, quote second. Smoke colour, sound and controller fault codes usually identify the failed component remotely within 30 minutes — no unnecessary teardown, no parts lottery.
Dual scheduling by running hours and calendar time. Oil, filters, coolant, batteries, belts and controller parameters — nothing skipped, every visit documented with photos.
Fast-moving parts for Cummins, Perkins, Volvo, Mitsubishi, Yuchai, Weichai and SDEC in stock. Every export set ships with a wear-parts kit so overseas clients are not waiting three months.
Reference values used across the industry; always confirm with the manufacturer’s derating curve and manual.
| Altitude | Factor | Ambient | Factor |
|---|---|---|---|
| 0 – 1000 m | 1.00 | ≤ 40 °C | 1.00 |
| 1500 m | ≈ 0.94 | 45 °C | ≈ 0.98 |
| 2000 m | ≈ 0.88 | 50 °C | ≈ 0.96 |
| 3000 m | ≈ 0.76 | 55 °C | ≈ 0.94 |
| 4000 m | ≈ 0.64 | 60 °C | ≈ 0.92 |
| Interval | Mandatory work | Also inspect |
|---|---|---|
| 50 h / 1 month | First oil change, oil filter, fuel filter | Belt tension, leaks, bolt torque, controller settings |
| 250 h / 6 months | Oil, oil filter, fuel filter, air filter cleaning | Battery voltage and charger, coolant level and freeze point |
| 500 h / 12 months | Air filter replacement, coolant test, oil analysis | Radiator cleaning, exhaust back pressure, insulation resistance |
| 1000 h | Injector calibration, valve clearance adjustment | Turbo axial play, water pump, anti-vibration mounts, protection test |
| 8000–12000 h | Major overhaul (based on compression and oil consumption) | Crankshaft, liners, rings, bearings, injection pump calibration |
Note: a set running below 30% load should be loaded to 80% for 60 minutes every four weeks, otherwise expect wet stacking, turbo oil seepage and carbon build-up.
The same answers our engineers give every week on the phone.
Take the maximum continuous load in kW and divide by 0.8 to get the prime power (PRP) rating. Then verify against starting current: a large induction motor draws 3–7 times rated current at start-up, and voltage dip should stay under 15%. Above 1000 m altitude or 40°C ambient, apply the manufacturer’s derating curve.
Required kW ≈ max continuous load kW ÷ 0.8 × derating factor. Example: 160 kW load at 2000 m → 160 ÷ 0.8 ÷ 0.88 ≈ 227 kW, so a 250 kW set is right and a 200 kW set is permanently overloaded.
Under ISO 8528, PRP is the rating for continuous operation with a varying load; ESP is for short-term use during utility failure, typically about 10% higher. Always size on PRP. Treating ESP as normal duty is permanent overload — oil consumption, high exhaust temperature and early turbo failure follow.
Five checks: hour meter versus mechanical wear; engine and head casting numbers against year of build; disassembly marks on sump, harness and bolts; carbon thickness in the exhaust manifold and turbo; and completeness of paperwork — factory test report, service records, customs documents.
Machines priced 20% below market with only a few hundred hours are the highest risk.
50 hours or one month for the first oil and filter change; every 250 hours or six months for oil, oil filter and fuel filter; every 500 hours or twelve months for the air filter, coolant and battery; every 1000 hours for valve clearance and injector calibration.
Whichever comes first — hours or calendar. Ignoring the calendar is the most common gap on standby sets: a machine running 40 hours a year still needs fresh oil, because oil oxidises.
Black = incomplete combustion: blocked intake, turbo fault, overload. White = unburned fuel or water: injection timing, leaking injector, head gasket. Blue = burning lube oil: worn rings, turbo seal leak, overfilled sump. Reading the smoke colour first halves diagnostic time.
Six steps: battery voltage (24V system ≥ 25.2V at rest); starter motor and solenoid; fuel system for air ingress or blocked filters; emergency stop and controller alarms; crankshaft position sensor and speed signal; oil pressure and coolant temperature protection.
About 80% of no-start cases are resolved in the first three steps — no teardown needed.
CE for the EU (including 2000/14/EC noise), EPA Tier 4 Final for US non-road, SONCAP for Nigeria, SASO/SABER for Saudi Arabia, EAC for Russia and Central Asia, and CoC at destination for several African markets. Match 50 Hz or 60 Hz and destination voltage, and ship English manuals, packing list and factory test report.
Buy when: under 3000 hours, complete service records, no leaks, passes an 80% load test, original controller. Expect 40–60% of new price.
Walk away when: over 12000 hours, low compression, heavy exhaust carbon, missing documents. The saving rarely pays for one overhaul.
Equipment list, motor ratings, starting method, application, site altitude and ambient temperature, utility situation. No list? Describing the application is enough.
Calculation shown, derating applied, three configuration tiers compared side by side — with the reasoning.
Engine, alternator and controller brands and models, silent / weatherproof / containerised format, certification, delivery terms and port.
Load test with report before shipment, wear-parts kit included, commissioning guidance on arrival; export orders include English documentation and operator training.
Use the form or email us directly. Overseas buyers: please state country, port and voltage/frequency.